Sunday, April 11, 2010

Day 2 6/4/2010 until Day 5 9/4/2010


Since it is very hard for me to maintain daily blog, i have decided to keep it on weekly basis. Second day was exciting as i was given the chance to enter the cool room, testing and production area. I was required to wear junk suit before entering cooal room. This is to avoid contamination of particles on the disk. The entire assembly process must be done in a clean environment. But before that, wd is a giant producer of hard disk drives (HDD). HDD is used to store information and data. Their nearest competitor is Seagate and CK. I was intoduced with the machines and the process flow. I have attached the pictures and videos to introduce some of the process flows.

No comments:

Post a Comment